A collection of articles on FAT, SAT, UAT, commissioning, acceptance criteria, defects, punch lists, test evidence, and operational readiness before handover.
Designed for projects that need to verify that delivered systems meet the agreed requirements and are genuinely ready for operation—not merely installed or reported as passed by the vendor.
When a new article is published and assigned to the designated category, it will appear on this page automatically without requiring any changes to the Hub HTML.
Key topics in Testing & Acceptance
Use these topics as the editorial framework for this category. Newly published articles will be collected below automatically.
Acceptance Criteria
Define what constitutes pass, fail, and conditional acceptance.
FAT
Verify the system before shipment from the factory or production source.
SAT
Verify the system after installation in the actual site and operating environment.
UAT
Validate usability and performance from the end-user and business-process perspective.
Defect & Punch List
Classify and track defects and outstanding items before handover.
Operational Readiness
Review training, documentation, support, and actual operational readiness.
Latest Articles
Automatically ordered by the latest publication date in this WordPress category.
Is your project facing one of these issues?
Share your project context with AEGIS so we can help identify where an independent review should begin. The initial consultation does not include a detailed technical review or formal evaluation.